DIA talking paper on AAWSAP UFO program, Jan 2009
Official file: DOW-UAP-D187, DIA Talking Paper for Senator Reid Engagement, January 2009
Published
Key facts
- Official file ID
- DOW-UAP-D187
- Document type
- Document
- Agency
- Department of War
- Released in
- R08 · 2026-11-20
- Incident date
- 1/2/09
- Incident location
- Washington, D.C.
- Coordinates
- 38.8950982, -77.0363849
- Pages legible
- 1/1
- VIRIN
- 261120-D-D0360-1181
Official description
This document is preparatory material for a scheduled senior leadership meeting involving Senator Harry Reid (D-NV) on 2 January 2009, intended to equip DIA leadership with concise status talking points on the AAWSAP contract in case he raised the subject. The document states that Senators Daniel Inouye (D-HI) and Harry Reid sponsored the July 2008 supplemental appropriations language directing DIA to investigate foreign advanced aerospace threats over a 40-year horizon, and it presents Reid’s interest in aerospace technologies as part of the background for the engagement. It further notes that Bigelow Aerospace Advanced Space Studies had been the only respondent to the August 2008 request for proposals, that its proposal was judged responsive, and that the contract had been signed on 22 September 2008. The document notes that DIA assessed the program to have produced reports of limited value, along with a recommendation that AAWSAP be transitioned to another agency.
About this type of document
This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time.
See the glossary →✦ AI summary
This is a one-page Defense Intelligence Agency (DIA) Talking Paper for the Director, dated 2 January 2009, prepared to brief LTG Maples on the status of the Advanced Aerospace Weapon System Applications contract in case Senator Reid raised it during a visit on 5 January 2009. It states that Senators Inouye and Reid sponsored language in the July 2008 Supplemental Appropriation bill for DIA to investigate foreign advanced aerospace weapon threats from the present out to 40 years in the future. DIA published a request for proposals on 18 August 2008, received only one bid, from Bigelow Aerospace Advanced Space Studies (BAASS), and signed the contract on 22 September 2008. The paper reports that BAASS submitted 12 technical-area program management plans on 21 November 2008, which were rated very good to excellent, and that the Defense Security Service inspected the BAASS facility on 17 December 2008 with a satisfactory result. The contract is described as on schedule and within cost, with all technical reports expected by the end of July 2009. The document does not describe any UAP sighting or object.
Generated with AI from the official file — may contain errors.
▸Transcript(1 of 1 pages legible)
[PAGE 1] UNCLASSIFIED//FOUO (FOUO struck through) U-326-09/DWO 02 January 2009 Talking Paper for the Director SUBJECT: (U) Senator Reid Visit to Director, DIA, 05 January 2009 1. (U) PURPOSE: To provide LTG Maples with the current status of the Advanced Aerospace Weapon System Applications contract should Senator Reid raise the topic. 2. (U//FOUO) BACKGROUND: Senator Inouye (D-HI) and Senator Reid (D-Nev) sponsored language in the July 2008 Supplemental Appropriation bill for DIA to investigate foreign advanced aerospace weapon threats from the present out to 40 years in the future. Senator Reid has a deep interest in the potential threat posed by unconventional aerospace technologies; that is, technologies that are a radical departure to those used in current advanced aerospace vehicles. In response to this tasking, the Acquisition Support Division (DWO-3) published a request for proposals (RFP) on 18 August 2008. DIA received only one bid, from Bigelow Aerospace Advanced Space Studies (BAASS), in response to the RFP. DIA/AE and DIA/DWO determined that the proposal was responsive and the contract signed on 22 September 2008. Since the Director's meeting with Senator Reid on 13 November 2008, the following items have been completed per the contract. 3. (U) TALKING POINTS: - (U//FOUO) Program Management Plans. BAASS submitted the 12 technical area program management plans (PMPs) on 21 November 2008. o (U//FOUO) DWO-3 reviewed the PMPs and rated them as very good to excellent. DWO-3 granted BAASS approval to proceed with the technical reports. o (U//FOUO) BAASS will deliver to DIA approximately two detailed reports per technical area. The goal is for DWO to have all reports by the end of July 2009. - (U//FOUO) Facility Clearance. The Defense Security Service conducted a site inspection on the BAASS facility on 17 December 2008. The inspection was completed satisfactorily and the facility clearance process is expected to be completed shortly. - (U//FOUO) Contract is on track. The contract is currently proceeding on schedule and within cost. The technical reports will be under subcontract by February 2009 and completed by the end of July 2009. (U) Prepared by: [redacted, marked 843(a)(2)] Defense Warning Office, Acquisition Support Division (DWO-3), [redacted, marked 843(a)(2)] UNCLASSIFIED//FOUO (FOUO struck through)
Generated with AI from the official file — may contain errors.
Source: U.S. Department of War / AARO — public domain · war.gov/ufo